Xicheng Canal Landscape – Opposite Parks reshapes 169.7 hectares of former industrial land in Jiangyin, China, into a four-kilometer canal corridor divided between an adaptable cultural park on the East Bank and a continuous ecological restoration landscape on the West Bank.
Xicheng Canal Landscape – Opposite Parks Technical Information
- ArchitectsBrearley Architects + Urbanists
- LocationJiangyin, Jiangsu Province, China View on map →
- Site Area1,697,000 m2 | 18,266,338 Sq. Ft.
- Project Years2017 – 2025
- Photographs© Inter_Mountain Images
Two landscapes in quiet opposition along Xicheng Canal: one shaped by nature, the other by culture.
– Brearley Architects + Urbanists
Canal Transformation and the Citywide Park Network
Xicheng Canal Landscape occupies a former industrial corridor at a consequential point in Jiangyin’s urban expansion. Over four kilometres, the project converts contaminated and heavily engineered canal edges into public landscape, while connecting new residential and mixed-use districts to a larger system of parks, greenways, waterways, and cycling routes. The canal is treated less as a residual infrastructural divide than as a linear civic armature whose two banks can accommodate different environmental and social intensities.
This reading of the site is structured through a network approach rather than a composition of singular park objects. Bicycle paths pass continuously through both banks and connect to the wider city greenway. Street-to-water paths establish repeated pedestrian access points, while bridges, retained structures, ecological zones, pavilions, and planted systems form overlapping spatial and operational layers. The result is not a uniform waterfront promenade but a sequence of linked conditions that can absorb the uneven demands of redevelopment, recreation, stormwater management, and habitat restoration.
The project also reframes post-industrial remediation as an urban design task. The canal landscape mediates between high-density development and water infrastructure that had previously been defined by hard edges, industrial remnants, and degraded embankments. Its long time frame is visible in the contrast between early planting and the more established canopy documented in later photographs. Rather than concealing the scale of transformation, the plan uses the canal’s linearity to make ecological repair and urban occupation legible as parallel processes.
Opposite Banks: Cultural Adaptability and Ecological Continuity
The project’s principal disciplinary proposition lies in its deliberate asymmetry. The East Bank is organized as an intensive cultural landscape, with sports areas, playgrounds, gathering spaces, gardens, pavilions, and flexible public programs. Across the canal, the West Bank is reserved for a more continuous indigenous ecosystem corridor. This division rejects the familiar tendency to duplicate amenities on both sides of a waterway, instead making contrast the basis for a broader and more differentiated public landscape.
On the East Bank, visual clarity, permeability, and frequent programmatic change are central. On the West Bank, ecological continuity requires the acceptance of denser vegetation, irregular edges, seasonal change, and areas where human movement is moderated. The two sides remain connected by views across the canal, shared greenway infrastructure, and bridge crossings, but they do not collapse into a single landscape language. Their opposition gives each bank a more precise role within the broader public realm.
This arrangement exposes a central tension in contemporary urban landscape practice. High-density neighbourhoods often demand immediate access, clean sightlines, open lawns, and visibly programmed amenities. Habitat corridors depend on the opposite conditions: understorey, wetland margins, deadwood, long grasses, secluded nesting areas, and restricted disturbance. The scheme does not fully resolve this conflict, but it places it at the centre of the park’s spatial organization. Ecological function is not relegated to decorative planting around recreation; it is assigned its own continuous territory.
The East Bank as a Field of 101 Adaptable Gardens
The East Bank is organized through a pentagonal tessellating field that divides the landscape into 101 complete or partial garden units. Each unit has an edge length limited to approximately 100 metres, a scale intended to support independent modification without destabilizing the overall framework. The geometry is not a conventional grid, nor does it establish a monumental centre. Instead, it produces a non-hierarchical field in which individual gardens can be redesigned, reprogrammed, or maintained on different cycles.
Over this field, the project layers direct pedestrian shortcuts, perimeter paths, bicycle routes, swales, tree alleys, walls, pavilions, and programmatic islands. From each intersecting street, a route leads toward the canal. In larger garden areas, diagonal paths enable pedestrians to move efficiently between bridges rather than follow a prescribed promenade sequence. This combination of geometric order and cross-cutting circulation gives the park a legible structure while allowing local episodes to remain distinct.
The gardens develop markedly different spatial identities. Pyramidal grass landforms are set against cobalt-blue planes; sports courts gather on canal peninsulas; rubberized playgrounds take the form of trefoils, rings, and looping fields; pump tracks turn recreation into a constructed topography. In the Contemporary Chinese Garden, long rust-toned and white walls intersect lawns and serpentine paths, recalling the enclosure and framed movement of historical garden traditions without reproducing them literally. Elsewhere, swales and planted terraces make water management visible as part of the public ground.
Pavilions operate as a distributed social infrastructure rather than as isolated landmarks. Small structures for informal gathering occur at short intervals, while kiosks, play spaces, cafes, and event areas appear at larger intervals along the corridor. Their repetition supports a walkable sequence of pauses and destinations, particularly important in a park whose total length exceeds the scale of a single visit. The framework therefore accommodates both the large urban view visible from above and the smaller, garden-by-garden experience of walking, cycling, playing, and stopping.
Rewilding, Industrial Memory, and the Limits of Public Acceptance
On the West Bank, the removal of concrete canal walls allows the water edge to become a graded and planted territory rather than a fixed engineering line. Vegetated slopes, riparian reeds, wetlands, frog ponds, rain gardens, islands, and sheltered water margins create a more complex set of aquatic and terrestrial habitats. These interventions are intended to support fish spawning, amphibian life, insects, and bird species associated with the Southern Yangtze region, while improving the ecological continuity of the canal through the city.
Public access is carefully moderated rather than eliminated. Meandering paths lead visitors through woodland, grassland, and wetland zones, while boardwalks provide controlled proximity to ponds and planted water edges. Larger functional elements, including parking areas, playgrounds, and plazas, adopt elongated boat-like footprints that recall deposited islands and reduce their visual dominance within the vegetation. The strategy acknowledges that an ecological corridor in a dense urban district cannot be entirely inaccessible, but it avoids making every metre of waterfront equally available for intensive use.
Industrial remnants provide another layer of continuity. Dock gantries, silos, chimneys, structural frames, and traces of former workers’ settlements are retained or reinterpreted as spatial anchors within the new landscape. A former dock gantry becomes a covered public structure, preserving the heavy concrete scale of canal logistics while supporting contemporary occupation. These elements resist the erasure often associated with waterfront redevelopment, allowing the history of labour, shipping, and industrial contamination to remain present in the transformed site.
The later pressure to replace native grasses with expansive lawns reveals the practical and cultural limits of rewilding in rapidly urbanizing contexts. A visually irregular landscape can be interpreted as neglect when its ecological functions are not readily understood. The proposed educational signage is therefore more than interpretation: it is a form of stewardship infrastructure, explaining how reeds filter water, why scrub supports habitat, and how restored edges contribute to a functioning food web. The success of the West Bank will depend not only on planting establishment and habitat performance, but also on whether public expectations can shift from ornamental control toward an appreciation of managed ecological complexity.













































About Brearley Architects + Urbanists
Brearley Architects + Urbanists (BAU) applies its Networks Cities framework, viewing successful urban form and space as layered, interconnected, adaptive systems rather than isolated objects.
Credits and Additional Notes
- Landscape designers: Steve Whitford, Fang Qun, James Brearley, Huang Fang, Guo Liexia, Wang Chenlei, Shi Zhengting, Pan Linlu, He Yuqing, Luo Li, Xu Wanyu, Alexander Abke, Pan Guo, Cheng Qi, Yuan Yao, Zhang Yi, Zhang Xinwei, Gu Zhuocheng, Xiong Juan, Lei Tao, Zhu Qizhen, Ni Yang, Yan Xiaoqian, Zheng Fangyi, Zhang Duo, Wu Xiaojian
- Client: Jiangyin Planning Bureau
- Architecture and Urban Design: Steve Whitford, James Brearley, Luo Huaili, Zhao Xudong, Wang Qian, Lim Shin Qin, Chen Zhiyong, Li Xufeng, Milly Gamlin
- Planning: Li Xiao, Wang Xiaoqi
- Interior: Guo Yuejiao, Chen Xianwei
- BIM: Wang Hongbin, Wang Shuangdiao
- 3D: Liu Yijun
- Documentation Partner: Hangzhou Landscape Architecture Design Institute Co., Ltd.
- Photography: Inter_Mountain Images
- Research references or publications: Designing Networks Cities, Routledge, 2024







































